Water Leakage was observed in the mullion joint during Dynamic Water Penetration Test (AAMA 501.1), Performance Mock-Up Test at Philco Facade Testing Laboratory, Meycauayan City, Bulacan on November 26, 2014.
by webadmin
Water Leakage was observed in the mullion joint during Dynamic Water Penetration Test (AAMA 501.1), Performance Mock-Up Test at Philco Facade Testing Laboratory, Meycauayan City, Bulacan on November 26, 2014.
John Michael Pacinos says